EXFO MaxTester 635 User Manual

Page 82

Advertising
background image

Setting Up Copper Tests

74

MAX-635

FED Setup

2. For Open, set the FED so that the T-R/A-B wires connected to the

customer side of the FED are open circuited.

3. For T-R-G/A-B-E Shorted, set the FED so that T-R-G/A-B-E are all short

circuited (connected to each other) at the customer side of the FED.

Note: P.U.T., in the above diagrams, refers to the Pair Under Test.

Remote is the FED, and Controller is the MaxTester.

Advertising