Blocks required – Pilz PSS SB NOT, Basic license User Manual
Page 69
Advertising
Modular Block System: Emergency Stop Circuits
6-27
Global parameters used in the administration data blocks
Global parameters may be set in OB120 using SB071.
• DW1002: Number of cycles for the reaction time of the feedback loop
with contactors
• DW1022: Minimum scan time
Blocks required
• DB015, DB016, DB017: Administration data blocks
The data blocks must consist of their total length of 1024 data
words and have READ/WRITE access (see Chapter 5, section
entitled “Administration data blocks...”).
• SB071:
Initialisation of global parameters in DB015, DB016 and DB017
Advertising
This manual is related to the following products: