Casella CEL Microdust Pro real time dust monitor User Manual

Page 40

Advertising
background image

MicroDust Pro Aerosol Monitoring System

40

Casella CEL

Figure 21.

PUF adapter installation

1 Pump connection

7 MicroDust sampling probe

2 Adapter block

8 Measuring chamber inlet

3 Locating spigots

9 PUF filter head cap

4 PUF filter holder PM

2.5

10 Filter cassette (25 mm / 37 mm)

5 PUF filter holder PM

10

/Respirable

11 O-rings

6 37 mm-to-25 mm reducer

To insert or remove PUF filters from their filter cassettes, use clean tweezers
and vinyl gloves. Do not allow the filters to become damaged, creased or folded
in any way.

Spare PUF filters are available from Casella CEL:

PM2.5 foams (packs of 10)

P/N P118204

PM10 foams (packs of 10)

P/N P118206

Respirable 2 foams (packs of 10)

P/N P118208

Advertising