Tools and equipment – H3C Technologies H3C S7500E Series Switches User Manual

Page 19

Advertising
background image

9

NOTE:

Figures for the mounting bracket, cable management bracket, and power cord management bracket
in

Table 5

are for illustration only.

Tools and equipment

Prepare the following tools and equipment yourself:

Mechanical lift.

Phillips screwdrivers P1–100 mm, P2–150 mm, and P3–250 mm.

Flat-blade screwdriver P4–75 mm.

Marker.

Tape.

Diagonal pliers, wire-stripping pliers, and wire clippers.

M6 wrench.

Cables such as network cables and fiber cables.

Meters and equipment, such as hub and multimeter.

Configuration terminal, such as PC.

NOTE:

The rack installation accessories and tools vary by rack model and are not included in this section. For
more information, see the installation guide for the rack.

Advertising