Installation instructions, Design of w-3way eco-i system unit specifi cations – Sanyo CHDZ09053 User Manual
Page 45
2-35
Design of W-3WAY ECO-i SYSTEM Unit Specifi cations
1
2
3
4
5
6
7
8
Front view
45
45
36
93
36
2
3
2
1
1
98
65-7/8
36
45
(32-1/8)
Air direction:
Front direction
Air direction:
Right direction
Ceiling panel
Ceiling panel
Front view
Right side view
Right side view
Ceiling panel
Front view
Right side view
unit: in.
unit: in.
54
31-1/2
31-1/2 (Air intake duct)
33-1/4 (Air outlet duct)
35
(Ceiling panel dimensions)
9-1/2
54
36
45
9-1/2
9-1/2
35
9-13/32
9-1/2
54
35
(Ceiling panel dimensions)
32
32-7/8
9-1/2
9-1/2
35
(Ceiling panel dimensions)
9-1/2
1
1
53-55/64
31-17/32
31-1/2
1 pc.
4 pc.
31-17/32
35-3/64
35-3/64
3-15/16
3-15/16
112-63/64
35-3/64
31-7/64
7-7/8
31-1/2
98
65-7/8
9-1/2
9-1/2
1
2
45
36
31-1/2
7-7/8
31-7/64
31-7/64
35-3/64
36-7/32
37-13/32
2
3
2
2
1
35 (Ceiling panel dimensions)
31-1/2 (Air intak
e duct)
33-1/4 (Air outlet duct)
Top (Before installation of snowfall protection duct)
2
3
2
35
31-1/4
37-1/2
7-7/8
3 - 15/16
31-1/8
70-1/8
31-1/8
74
35
35
Note: Can be installed so that the air direction is to the front, right, left or rear direction.
Reference diagram for snow-proof ducting (field supply)
2-unit installation
4. Installation Instructions
4-7. Dimensions of Wind Ducting