Sanyo CHDZ09053 User Manual

Page 54

Advertising
background image

2-44

Design of W-3WAY ECO-i SYSTEM Unit Specifi cations

1

2

3

4

5

6

7

8

4. Installation Instructions

Suspension bolt (3/8" or M10) (field supplied)

Nut (field supplied) (3/8" or M10)

Washer

M4 screws

(12 pcs.)

Suspension hook

Installation of Solenoid Valve Kit

1. Install the relay kit into the indoor unit.

Refer to the Installation Manual for the solenoid valve kit.

2. Connect the solenoid valve kit and the relay kit in the field.

Relay kit

Front

Cover of control box

Suction tube

Discharge tube

Top surface

Suspension hook

Gas tube

Liquid tube

Liquid tube

Connect with

conduit for

power supply

Front

7-7/8" or more

Service space

NOTE

Notes on Installation

Be sure to secure the valve body by using its structure with the suspension bolt, etc.
Install the valve body within a distance of 98 ft. from the indoor unit.

Some refrigerant noise will be produced. Therefore in hospitals, libraries, hotel guest rooms, and other quiet locations, it is
recommended that the solenoid valve kit be installed on the ceiling reverse side of a hallway or another location separated
from the room.

When installing the valve body, install with the top surface facing up. Secure 7-7/8" or more of space to the front so that the

front service panel can be removed.

If the supplied suspension hook will not be used, and other fastening devices will be attached in the fi eld, use the 4 screw

holes on the top surface. DO NOT use any long screws other than the supplied screws. Use of other screws may puncture
the internal tubing, resulting in refrigerant leakage.

Do not block the air holes.

Advertising
This manual is related to the following products: