4. Installation Instructions

4-8. Transporting the Outdoor Unit

When transporting the unit, have it delivered as close to the
installation site as possible without unpacking.
Use a hook for suspending the unit. (Fig. 4-11)

When hoisting the outdoor unit, pass ropes or straps under the bottom

plate as shown in the figure at right. When hoisting, the angle between

the rope and top panel must be 70° or greater so that the rope does

not come into contact with the fan guard.

(Use 2 lengths of rope 25 ft. long or longer.)

When passing the ropes through the square holes of the bottom plate:

Place the rope in the outer edge of the square holes.

Use protective panels or padding at all locations where the rope con-

tacts the outer casing or other parts to prevent scratching. In particu-

lar, use protective material (such as cloth or cardboard) to prevent the

edges of the top panel from being scratched.

Be careful of the fan.

There is danger of injury if the fan starts to turn during inspection. Be

sure to turn OFF the remote power switch before beginning inspection.

4-9. Installing the Outdoor Unit

(1) Use anchor bolts (M12 or 15/32") or similar to securely anchor the

unit in place. (Fig. 4-12)

(2) Be sure the rubber vibration insulator and platform extend to the

inside of the legs. In addition, the washers used to anchor the unit

from the top must be larger than the installation anchor holes. (Figs.

4-12 and 4-13)

Fig. 4-11

Fig. 4-12

Fig. 4-13

(4)

(4)

3-1/2

2

2

Washer

Plate leg

Base

Anchor bolts

Vibration insulator

CAUTION

1-1/2

5/8

2

4 – 5/8 6/8 hole

(Detailed view of legs)

Surf

ace where

installation anchor

br

ac

kets are

installed

Unit: in.

Unit: in.

74 (Ceiling panel dimensions)

70-1/8 (Installation hole pitch)

35 (Ceiling panel dimensions)

35 (Ceiling panel dimensions)

35 (Ceiling panel dimensions)

31-1/8 (Installation hole pitch)

31-1/8 (Installation hole pitch)

36-1/4 (Installation hole pitch)

37-1/2 (Maxim

um dimensions)

The vibration insulator, base, or platform must
be large enough to bear the full surface of the
base plate legs.

Unit: in.

Top view

(Positions where anchor bolts are fastened)

31-1/8 (Installation hole pitch)

37-1/2 (Maxim

um dimensions)

35 (Ceiling panel dimensions)

36-1/4 (Installation hole pitch)

35 (Ceiling panel dimensions)

Installation anchor hole (4 – 19/32

× 25/32 oval holes)

Advertising
This manual is related to the following products: