2 secure the cover by installing the 17 screws bac, Power-up and test, 1 reconnect all the cables, including – Nortel Networks 6300 User Manual

Page 130: 2 turn on the unit’s power, 3 set the remote annex to test mode by pressing an, Figure d-4 . setting the remote annex 6300 to test, The ethernet cable, The pri isdn interface cable, The console terminal cable, The power cord

Advertising
background image

Remote Annex 6300 Hardware Installation Guide

Appendix D

Modem Upgrade Instructions

D-6

2

Secure the cover by installing the 17 screws back into the cover,
starting at the rear and working to the sides.

Do not over-tighten these screws (beyond 10 in-lbs.
of torque).

Power-up and Test

The following instructions describe the power-up and test sequence.

1

Reconnect all the cables, including:

The Ethernet cable

The PRI ISDN Interface cable

The console terminal cable

The power cord

2

Turn on the unit’s power.

3

Set the Remote Annex to Test mode by pressing and holding the

button (located on the front panel) for three seconds

(see

Figure D-4

).

The Remote Annex runs its ROM-resident power-up diagnostics.

Figure D-4. Setting the Remote Annex 6300 to Test Mode

Reset

Reset

Button

Bay Networks

Remote Annex 6300

Xylogics, a Bay Networks Company

32

31

30

29

28

27

26

25

24

23

22

21

20

19

18

17

16

15

Modem Status

14

13

12

11

10

9

8

7

6

5

4

3

2

1

CD

Tx/Rx

13-16 9-12

5-8

1-4

29-32 25-28 21-24 17-20

Modem Config

Status

Test Sync Los

Red

Yel

Blu

Stat

Traf

Setup

Reset

Power

Attn

Network/Status

Ararms

32

31

30

29

28

27

26

25

24

23

22

21

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

PRI Channel Status

Advertising