Powering up and testing the remote annex 6300, 1 verify the remote annex 6300’s operational power, Figure 2-12 . verifying the remote annex 6300 oper – Nortel Networks 6300 User Manual

Page 50: 2 apply power, Powering up and testing the remote annex 6300 -14

Advertising
background image

Remote Annex 6300 Hardware Installation Guide

Chapter 2

Installing the Remote Annex 6300

2-14

Powering Up and Testing the Remote Annex 6300

Power-up and test your Remote Annex 6300 as follows:

1

Verify the Remote Annex 6300’s operational power range.

Check that the power select switch is set to the 110V position
for operation in the 90 to 130 VAC range, or to the 220V
position for operation in the 180 to 260 VAC range (see

Figure 2-12

).

Figure 2-12. Verifying the Remote Annex 6300 Operational Power Range

Setting the power select switch incorrectly can damage the
Remote Annex 6300.

2

Apply power.

Connect the female end of the power cord to the AC line socket.
Connect the male end to an active AC line outlet (see

Figure 2-13

). Turn the power switch on. The Power LED is

now active.

Power Select

Switch

CONSOLE

10BASE5

10BASET

ISDN PRI

LINK

10BASE2

115

Advertising