6 initial operation and basic checks, Lrs-24 with cm-1 module – RAD Data comm LRS-24 User Manual

Page 55

Advertising
background image

LRS-24 Installation and Operation Manual

Chapter 2 Installation and Setup

Initial Operation and Basic Checks

2-27

Table 2-11 lists the supervisory cable pin arrangement.

Table 2-11. CM-1 Module Management RS-232 Pin Allocation

Pin

Function/Connection

2

Transmit data

3

Receive data

7

Signal ground

2 and 3

Crossed

4 and 6

Crossed

2, 3

Transmit or receive data

1, 6

Receive or transmit data

Connection to I/O (User) Modules

Refer to the Installation and Operation Manual of the corresponding module.

2.6 Initial Operation and Basic Checks

This section describes the operation instructions and basic checks for the following

configurations:
• LRS-24 with CM-1 Module
• LRS-24 with CM-2 Module.

LRS-24 with CM-1 Module

Power On

To turn on LRS-24 (CM-1):
1. Set the ON/OFF switches on the panels of the LRSI-PSP** modules to ON.
2. Supply the DC power, if applicable.

To supply external phantom feed voltages:
1. Turn on LRS-24.
2. Turn on the source, i.e. LRS-PS-FEED.

Normal Indications

PS Module(s): All the indicators on the panel(s) of the PS module(s) turn green

to indicate proper operation.

CM-1 Module: The POWER indicator of the module lights up. The TD and

RD indicators flash (or light steadily) when a management session is in
progress.

Order from: Cutter Networks

Ph:727-398-5252/Fax:727-397-9610

www.bestdatasource.com

Advertising