Toshiba RAS-09LKV-UL User Manual

Page 107

Advertising
background image

– 107 –

No.

‰

Part name

Electronic

expansion valve

coil

Procedure

Š

Wire guard

1. Detachment

1) Perform work of item 1 of

‚

.

2) Remove the front cabinet, and put it down

so that wire guard side directs downward.

Perform work on a corrugated cardboard,
cloth, etc. to prevent flaw to the product.

3) Remove the guard stopper (4 pcs.) from hook

of wire guard.

4) Turn the front cabinet into opposite site then

FILE NO. SVM-10019

pull wire guard up ward.

2. Attachment

1) Insert claws (2 positions) of the wire guard

in the holes of the front cabinet. Push the

hook (4 positions) by hands and fix by

Check that all the claws & hooks are fixed
to the specified positions.

1. Detachment

1) Perform step 1 in

‚

, all the steps in

ƒ

and 1 in

…

.

2) Remove the coil by pull it upward.

2. Attachment

1) Insert a valve coil to value body by push

it downward. And confirm to fix it surely.

Remarks

guard stopper.

Advertising
This manual is related to the following products: