Refrigerant cycle diagram, 1. refrigerant cycle diagram – Toshiba RAS-09LKV-UL User Manual

Page 21

Advertising
background image

– 21 –

7. REFRIGERANT CYCLE DIAGRAM

7-1. Refrigerant Cycle Diagram

RAS-09LKV-UL / RAS-09LAV-UL

NOTE :

• The maximum pipe length of this air conditioner is 66ft (20 m). When the pipe length exceeds 50ft (15m), the additional

Deoxidized copper pipe

Outer dia. : 3/8 in (9.52mm)

Thickness : 1/32 in (0.8mm)

NOTE :

Gas leak check position

Refrigerant flow (Cooling)

Refrigerant flow (Heating)

INDOOR UNIT

T1

TO

Temp. measurement

TC

TA

Indoor heat

exchanger

Cross flow fan

Deoxidized copper pipe

Outer dia. : 1/4 in (6.35mm)

Thickness : 1/32 (0.8mm)

Sectional shape

of heat insulator

Allo

w

ab

le height

dif

ference :

33ft (10mm)

Allo

w

ab

le pipe length

P

Pressure measurement
Gauge attaching port

Vacuum pump connecting port

Strainer

Pulse Modulating

valve at liquid side

TD

4-way valve

Compressor

DA89X1C-23FZ2

TS

T2

Outdoor heat

exchanger

Temp. measurement

Propeller fan Refrigerant amount : 1.77lbs (0.80kg)

OUTDOOR UNIT

Muffler

Muffler

TE

Min. : 6.6ft (2m)

Chargeless : 50ft (15m)

Strainer

Max. : 66ft (20m)

Charge : 0.22oz/ft

(51 to 66ft)

charging of refrigerant, 0.22 oz/ft (20g/m) for the part of pipe exceeded 50ft (15m) is required. [(Max. 0.22 lbs (100g)]

[20g/m (16 to 20m)]

FILE NO. SVM-10019

High Pressure switch

Fusible plug

Advertising
This manual is related to the following products: