Grain Systems Bin Accessories PNEG-1451 User Manual
Page 43
![background image](/manuals/277577/43/background.png)
6. 2.66" Corrugated Commercial Hopper Tank 10-22 Rings
PNEG-1451 Ladder, Safety Cage and Platform for Hopper Tanks
43
Eave Starter Bracket and Ladder Assembly with Safety Cage
Once the two (2) 3/8" holes have been field drilled, attach the starter brackets to the sidewall as shown in
. Check the top ladder section to make sure the ladder rung dimples are to the top. Attach starter
brackets to the top of the ladder. It will be necessary to field drill a 3/8" hole in the ladder section for the
starter bracket as well.
for the proper installation
of additional ladder sections required. Standoff brackets must be installed on the ladder sections and
attached to the sidewall at each horizontal seam and repeated every 32". Use 5/16" x 3/4" bin bolts for
all connections.
Figure 6D
for additional details for standoff bracket to ladder assembly and
8' extension rail installation (omitted in detailed image above for clarity).