Grain Systems Bin Accessories PNEG-1451 User Manual

Page 43

Advertising
background image

6. 2.66" Corrugated Commercial Hopper Tank 10-22 Rings

PNEG-1451 Ladder, Safety Cage and Platform for Hopper Tanks

43

Eave Starter Bracket and Ladder Assembly with Safety Cage

Once the two (2) 3/8" holes have been field drilled, attach the starter brackets to the sidewall as shown in

Figure 6D

. Check the top ladder section to make sure the ladder rung dimples are to the top. Attach starter

brackets to the top of the ladder. It will be necessary to field drill a 3/8" hole in the ladder section for the
starter bracket as well.

(See Figure 6F on Page 44.)

See Figure 4B on Page 13

for the proper installation

of additional ladder sections required. Standoff brackets must be installed on the ladder sections and
attached to the sidewall at each horizontal seam and repeated every 32". Use 5/16" x 3/4" bin bolts for
all connections.

Figure 6D

NOTE:

Refer to Figure 4A on Page 12

for additional details for standoff bracket to ladder assembly and

8' extension rail installation (omitted in detailed image above for clarity).

Advertising