8. 4.00" Corrugation Farm Commercial Hopper Tank (FCHT) 7-9 Rings

84

PNEG-1451 Ladder, Safety Cage and Platform for Hopper Tanks

Eave Starter Bracket and Ladder Assembly with Safety Cage

Once the two (2) 3/8" holes have been field drilled, attach the starter brackets to the sidewall as shown in

Figure 8C

. Check the top ladder section to make sure the ladder rung dimples are to the top. Attach starter

brackets to the top of the ladder. See general detail information

on Page 12

for the proper installation

of additional ladder sections required. Standoff brackets must be installed on the ladder sections and
attached to the sidewall at each horizontal seam and repeated every 44". Use 5/16" x 3/4" bin bolts for all
connections. It is also necessary to field drill a 3/8" hole on the ladder section for each starter bracket
(L.H. and R.H.).

NOTE: Refer to general detail information

on Page 12

for additional details for standoff bracket to ladder

assembly and also, 8' extension rail installation (omitted in detail for clarity).

Figure 8C