Grain Systems Bin Accessories PNEG-1451 User Manual

Page 67

Advertising
background image

7. 4.00" Corrugation Farm Commercial Hopper Tanks (FCHT) 4-6 Rings

PNEG-1451 Ladder, Safety Cage and Platform for Hopper Tanks

67

Location of Field Drilled Holes for Eave Ladder Starter Brackets

The starter brackets must be located directly below the roof ladder. Before the starter brackets can be
installed, two (2) 3/8" holes must be drilled 4" below and directly in line with the top row of pre-punched
horizontal holes. The first hole, for the left hand starter bracket, must be located 9-3/8" from the center of
the stiffener to the center of the hole. The second hole, for the right hand bracket, must be located
18-3/4" from the center of the first hole.

Refer to Figure 7B

for the proper location of the two (2) 3/8" field

drilled holes required to install the starter brackets.

Figure 7B