8. 4.00" Corrugation Farm Commercial Hopper Tank (FCHT) 7-9 Rings

PNEG-1451 Ladder, Safety Cage and Platform for Hopper Tanks

93

Access Door/Base Platform Mounting Angle Installation

Figure 8R

shows the location of the access door platform mounting angles. All four (4) angles must be

mounted starting 16" above the top horizontal seam of the bottom ring with the first mounting angle directly
in line with the left hand eave mounting angle. The second mounting angle must be located 56-1/4" to the
left of the first mounting angle. The remaining two (2) mounting angles will be installed in the stiffeners
located on each side of the access door. When installed correctly, there should be 37-1/2" between the
two (2) sets of mounting angles. Pay careful attention when installing these angles. The dimensions and
locations of these angles are very critical to assure proper fit of all parts.

Figure 8R

Refer to chart on page 82

for distance between
mounting angles.

Eave platform mounting angles
shown for reference only. (

See

Page 87

for installation details.)