Eave platform mounting angle installation – Grain Systems Bin Accessories PNEG-1451 User Manual

Page 87

Advertising
background image

8. 4.00" Corrugation Farm Commercial Hopper Tank (FCHT) 7-9 Rings

PNEG-1451 Ladder, Safety Cage and Platform for Hopper Tanks

87

Eave Platform Mounting Angle Installation

Figure 8H

shows the location of the platform mounting angles. Each angle must be mounted starting

8" above the top horizontal seam of the second ring with the first mounting angle offset 9-3/8" from the
right hand starter bracket. The second mounting angle must be located 56-1/4" from the first mounting
angle. The dimensions and locations of these angles are critical for proper fit of all parts. Using the platform
mounting angles as guides, field drill 3/8" holes in the sidewall every 8".

(See Figure 8H.)

Figure 8H