Grain Systems Bin Accessories PNEG-1451 User Manual
Page 95
![background image](/manuals/277577/95/background.png)
8. 4.00" Corrugation Farm Commercial Hopper Tank (FCHT) 7-9 Rings
PNEG-1451 Ladder, Safety Cage and Platform for Hopper Tanks
95
Base/Access Door Starter Bracket and Ladder Assembly with
Safety Cage
Once the two (2) 3/8" holes have been drilled, attach the starter brackets to the sidewall as shown in
. Check the top ladder section to make sure the ladder rung dimples are to the top surface and
attach to the starter brackets using the holes located 1" from the top of the ladder. See general detail
information
for installation of additional ladder sections required. Now, standoff brackets must
be installed on the ladder sections and attached to the sidewall at each horizontal seam (repeating
every 44") until reaching the ground. (Use 5/16" x 3/4" bin bolts for all connections.)
Figure 8T
NOTE: Refer to general detail information
for additional details for standoff bracket to ladder
assembly and ladder section assembly.