Grain Systems Bin Accessories PNEG-1451 User Manual

Page 95

Advertising
background image

8. 4.00" Corrugation Farm Commercial Hopper Tank (FCHT) 7-9 Rings

PNEG-1451 Ladder, Safety Cage and Platform for Hopper Tanks

95

Base/Access Door Starter Bracket and Ladder Assembly with
Safety Cage

Once the two (2) 3/8" holes have been drilled, attach the starter brackets to the sidewall as shown in

Figure 8T

. Check the top ladder section to make sure the ladder rung dimples are to the top surface and

attach to the starter brackets using the holes located 1" from the top of the ladder. See general detail
information

on Page 12

for installation of additional ladder sections required. Now, standoff brackets must

be installed on the ladder sections and attached to the sidewall at each horizontal seam (repeating
every 44") until reaching the ground. (Use 5/16" x 3/4" bin bolts for all connections.)

Figure 8T

NOTE: Refer to general detail information

on Page 12

for additional details for standoff bracket to ladder

assembly and ladder section assembly.

Advertising