6. 2.66" Corrugated Commercial Hopper Tank 10-22 Rings

52

PNEG-1451 Ladder, Safety Cage and Platform for Hopper Tanks

Intermediate Platform Mounting Angle Installation

For bins with 18-22 rings, an intermediate platform is required.

Figure 6S

shows the location of the

intermediate platform mounting angles. Each angle must be mounted starting 4" below the top horizontal
seam of the ring specified in the

Chart on Page 41

, with the first mounting angle directly in line with the left

hand eave mounting angle. The second mounting angle must be located 56-1/4" to the left of the first
mounting angle. Pay careful attention when installing these angles. The dimensions and locations of these
angles are critical to assure proper fit of all parts. Using the platform mounting angels as guides, field drill
3/8" holes in the sidewall every 8".

(See Figure 6I on Page 46.)

Figure 6S

Refer to chart on
page 41

for distance

between platform
mounting angles
(Section A) and ring
location (Section C).

Eave platform mounting
angles shown for reference
only. (

See Page 38

for

installation details.)