Base platform mounting angle installation – Grain Systems Bin Accessories PNEG-1451 User Manual

Page 56

Advertising
background image

6. 2.66" Corrugated Commercial Hopper Tank 10-22 Rings

56

PNEG-1451 Ladder, Safety Cage and Platform for Hopper Tanks

Base Platform Mounting Angle Installation

Figure 6W

shows the location of the base platform mounting angles. Each angle must be mounted starting

4" below the top horizontal seam of the third ring from the bottom of the tank with the first mounting angle
directly in line with the left hand eave or intermediate mounting angle (if applicable). The second mounting
angle must be located 56-1/4" to the left of the first mounting angle. Pay careful attention when installing
these angles. The dimensions and locations of these angles are critical to assure proper fit of all parts and
integration with the access door platform.

Figure 6W

Eave mounting brackets (10-17 rings)
or intermediate mounting brackets
(18-22 rings) shown for reference only.

See Page 52

for installation details.

Advertising