Right hand platform and platform support assembly – Grain Systems Bin Accessories PNEG-1451 User Manual

Page 72

Advertising
background image

7. 4.00" Corrugation Farm Commercial Hopper Tanks (FCHT) 4-6 Rings

72

PNEG-1451 Ladder, Safety Cage and Platform for Hopper Tanks

Right Hand Platform and Platform Support Assembly

NOTE: Mount the platform supports on the bin first. Next, assemble the platform floor onto the support

frame. Do not tighten platform support to floor brace bolts until the floor and toe plates are secure.

Assemble the platform support frame using 5/16" x 3/4" truss head bolts and nuts. When attaching the
platform mounting angles to the sidewall, locate the mounting angles according to the instructions on
previous pages. Align holes on the platform floor with the holes on platform supports and bolt together
using 5/16" x 3/4" truss head bolts and nuts. Attach platform toe plates at the same time as attaching the
platform floor. The vertical entrance angle bolts to the platform floor, toe plate and platform support.
The handrail post bolts to the platform floor and toe plate as shown in

Figure 7I

.

Figure 7I Right Hand Platform

Figure 7J Right Hand Platform Support Assembly

Advertising