Grain Systems Bin Accessories PNEG-1451 User Manual

Page 54

Advertising
background image

6. 2.66" Corrugated Commercial Hopper Tank 10-22 Rings

54

PNEG-1451 Ladder, Safety Cage and Platform for Hopper Tanks

Intermediate Starter Bracket and Ladder Assembly with
Safety Cage

After drilling the two (2) 3/8" holes, attach the starter brackets to the sidewall as shown in

Figure 6U

. Check

the top ladder section to make sure the ladder rung dimples are to the top surface and attach to the starter
brackets using the holes located 1" from the top of the ladder. See general detail information

on Page 12

for proper installation of additional ladder sections required. Standoff brackets must be installed on the
ladder sections and attached to the sidewall at each horizontal seam (repeating every 32") until reaching
the base platform. (Use 5/16" x 3/4" bin bolts for all connections.) In addition to the two (2) field drilled holes
in the sidewall for the starter bracket, it is also be necessary to field drill a 3/8" hole in the ladder section
for the starter bracket. Refer to the section in these instructions that references the location of the
base platforms.

Figure 6U

Advertising