3. Foundation Requirements

PNEG-1510 Top Dry 24', 30' and 36' Manual Batch

13

Duct and Drying Fan Pad Optional

Placement of the Duct Fan Pad: GSI Top Dry Duct System only.

Refer to

Figure 3E

to determine the duct pad size.

1. The top of this pad should be level with the top of the bin’s foundation.

2. Recommended pad thickness is 4" minimum.

3. Front of pad should be perpendicular to bin wall.

Figure 3E