Perforated center band, Assembly – Grain Systems PNEG-1510 User Manual

Page 71

Advertising
background image

9. Assembly

PNEG-1510 Top Dry 24', 30' and 36' Manual Batch

71

Perforated Center Band

Drill six (6) 3/8" diameter holes equally spaced as shown in

Chart

for top band clips. Attach clips using

5/16" x 3/4" bin bolts. Add perforated band sections. Note that these do not attach to the leveling bands
but hang down on the inside of the top inner leveling band.

(See Figure 9V.)

Figure 9V

Nominal Diameter

of Tank (Ft.)

# of Holes

Dimension

24'

6

25-1/4"

30'

6

22"

36'

12

30"

Nominal Diameter

of Tank (Ft.)

Part # “A”

Qty

24'

TD-100219

3

30'

TD-100545

6

36'

TD-100726

6

Advertising