9. Assembly

60

PNEG-1510 Top Dry 24', 30' and 36' Manual Batch

Winch Assembly

Complete erection of bin. Install winch as shown using 5/16" x 3/4" bin bolts to attach to the sidewall. The
cable clamps from either side of the pulley on the cross channel should be removed and the dump chutes
pulled tightly shut. Check for the uniformity of the chains on the dump chutes and re-adjust if needed. The
downward travel of the chutes must be limited to prevent damage on new Top Dry bins. This can be done
after the bin is complete and the cable stop bracket and clamp is set to indicate when the dump chutes
are fully closed. Open the chutes until the cable clamp is about 30" above the cable stop bracket. Attach
another cable clamp just below the small outside pulley bracket making sure it is tight.

(See Figure 9I.)

Figure 9I