9. Assembly
PNEG-1510 Top Dry 24', 30' and 36' Manual Batch
59
Dump Chute Chain Assembly (Continued)
Figure 9G
Figure 9H
NOTE: Field cut rounded notches in the outer leveling band(s) where the two (2) roof ladder support
channels hang from the roof ribs.