Dump chute chain assembly – Grain Systems PNEG-1510 User Manual

Page 58

Advertising
background image

9. Assembly

58

PNEG-1510 Top Dry 24', 30' and 36' Manual Batch

Dump Chute Chain Assembly

Attach all dump chute chains directly to the lift (TD-100801) plate as shown

in Figure 9F

.

Install all chains using “S” hooks (S-4692) to attach the chains to the dump chutes and lift plates. Keep
excess chain at the lift plate. Adjust the chains until the chutes are approximately level when the lift plate
is in the closed (up) position. Once the chains are uniformly adjusted, crimp the “S” hooks closed. Check
when attaching the “S” hook to the end link on a chain that the end has not been cut open. If this is found
remove the end link or shift up and use the next link in chain. The lift plate should be approximately 12"
down from the cross channel when the chutes are level.

Figure 9F

Advertising