8. Installation

PNEG-1510 Top Dry 24', 30' and 36' Manual Batch

45

36' Leveling Band Post Installation

Install the leveling band posts on the floor as shown

in Figure 8I

.

The third, sixth, tenth and twelfth holes in the floor sheets indicate the location of the leveling band posts.
Attach with 5/16" x 1-1/4" bin bolts (S-277). In the third hole from the bottom of the floor sheets there will
be eighteen (18) posts (one in every other sheet). In the sixth and tenth hole there will be twelve (12) posts
(one at every third sheet). In the twelfth hole there will be six (6) posts (one every sixth sheet).

Figure 8I