Optional rotary switch roof locations, Optional rotary switch panel locations, Assembly – Grain Systems PNEG-1510 User Manual

Page 72

Advertising
background image

9. Assembly

72

PNEG-1510 Top Dry 24', 30' and 36' Manual Batch

Optional Rotary Switch Roof Locations

Figure 9W Overhead View of Optional Rotary Switch Locations

Optional Rotary Switch Panel Locations

Drill 2" diameter holes through roof panels at locations as shown

in Figure 9W

. Use a mounting plate as

a pattern and drill four (4) 3/8" holes through roof panels at each switch location so the plate can be bolted
to the roof.

Figure 9X

Top Dry Bin

Diameter

“A”

24'

23-1/2"

30" and 36"

19"

Advertising