Roof assembly – Grain Systems PNEG-1510 User Manual

Page 56

Advertising
background image

9. Assembly

56

PNEG-1510 Top Dry 24', 30' and 36' Manual Batch

Roof Assembly

Special Instructions

See roof installation manual located with roof hardware package.

1. Use eave clips for 24' tanks (TD-101017) and eave clips for 30'-36' tanks (TD-101074). The Top Dry

eave clips are located in the roof hardware package.

2. Locate eave clips so that a roof sheet will be centered over sidewall ladder.

3. Use roof brackets (TD-100274) shipped in the roof hardware package.

(See Figure 9C.)

Figure 9C

Advertising