30' leveling band post installation – Grain Systems PNEG-1510 User Manual

Page 44

Advertising
background image

8. Installation

44

PNEG-1510 Top Dry 24', 30' and 36' Manual Batch

30' Leveling Band Post Installation

Install the leveling band posts on the floor as shown

in Figure 8H

.

The fourth, seventh and tenth holes in the floor sheets indicate the location of the leveling band posts.
Attach with 5/16" x 1-1/4" bin bolts (S-277). In the fourth and seventh hole there will be ten (10) posts
(one at every third sheet). In the tenth hole there will be six (6) posts one every fifth.

Figure 8H

Advertising