Assembly – Grain Systems PNEG-1510 User Manual

Page 73

Advertising
background image

9. Assembly

PNEG-1510 Top Dry 24', 30' and 36' Manual Batch

73

Optional Installation of Roof Mounted Level Switches

Drill 2" diameter holes through roof panels at locations as shown in

Figure 9W on Page 72

. Use a mounting

plate as a pattern and drill four (4) 3/8" holes through roof panels at each switch location so the plate can
be bolted to the roof.

Attach flex coupling to the power-pak and install roll pin. Apply teflon tape or pipe sealant (not included)
to power-pak pipe threads and thread power-pak into mounting plate coupling. Conduit opening in
power-pak should be at right angles to roof rib or face toward eave.

Caulk underside of mounting plate above and both sides of 2" hole. Bolt to roof panel.

(See Figure 9Y.)

Figure 9Y Over Flow Level Switch (TAF-6103)

* Hardware package not shown

- Included in hardware package

Ref #

Part #

Description

Weight

Qty

1

TD-100076

Rotary Switch Power-Pak

3.50

1

2

TD-100627

Roof Mount Coupling Weldment

2.14

1

3

TD-100075

Flex Coupling

0.50

1

4

S-7241

1/8" x 1-1/4" Cotter Pin

0.02

2

5

TAF-6086

3 Vane Paddle

0.75

1

*

TAF-6097

Hardware Package

0.98

1

-

PNEG-300

Rotary Switch Instructions

0.04

1

-

S-275

5/16"-18 x 3/4" Bin Bolt

0.16

6

-

S-3651

Tube Seal

0.74

1

-

S-396

5/16"-18 Hex Nut

0.06

6

-

S-7241

1/8" x 1-1/4" Cotter Pin

0.02

2

Advertising