Transition installation (tr-4734), Assembly – Grain Systems PNEG-1510 User Manual

Page 75

Advertising
background image

9. Assembly

PNEG-1510 Top Dry 24', 30' and 36' Manual Batch

75

Transition Installation (TR-4734)

Before cutting the opening check that TR-4734 is the transition that was ordered.

When installing the GSI aeration transition, it will be necessary to field cut a hole into the bottom sidewall
ring (usually straight across from the unload auger).

Refer to Figure 9AA

for proper dimensions of

cut-out. The base angle will also need to be cut at entrance collar cut-out. Take note of the

Figure 9AA

showing the 1" dimension from bottom of entrance collar side bracket to concrete. This is important for
proper fit of transition.

NOTE: Entrance collar side bracket must be bolted on the inside of the bin sidewall.

Figure 9AA As Viewed from Inside Bin

Part #

Description

Qty

S-275

5/16"-18 x 3/4" Bin Bolt Grade 5

125

S-280

#10- 16 x 5/8" Self-Drilling Screw

10

S-3651

Tube Caulk - Gray Butyl #506-15

1

S-396

5/16"-18 Hex Nut Grade 2

125

S-7264

Spec Neoprene Seal Strip w/ ADH

10'

Advertising