Flighting assembly – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-720-G2 User Manual

Page 27

Advertising
background image

5. Assembly

PNEG-720-G2 12" and 16" Series II Sweep

27

Flighting Assembly

A. Lay out the flight sections in order of assembly starting with the head flight working towards the

tail flight.

(See Figure 5C.)

B. Using the connecting stubs, bolt the flight sections together with hex bolts and lock nuts. Make sure

the flight ends are in time with each other.

Figure 5C

C. Slide the end stub through the bearing plate on the tail section and into the tail flight securing it with

hex bolts and lock nuts.

(See Figure 5D.)

Figure 5D

Advertising