Sheave installation – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-720-G2 User Manual

Page 42

Advertising
background image

5. Assembly

42

PNEG-720-G2 12" and 16" Series II Sweep

Sheave Installation

NOTE: Owners and installers of 7000 bushel per hour Series II Sweeps using 230/460/575 Volt,

60 Hertz power should note that the belt drive for a 7000 bushel per hour sweep uses a special
“Speed Up” style belt and sheave arrangement. The drive sheave is larger than the driven sheave.
In almost all cases the drive sheave is a 7.15" outside diameter (6.8" P.D.) with the driven sheave
a 6.3" outside diameter (6" P.D.)

Figure 5X

A. Loosely bolt the bushing and large sheave together with the screws provided with the bushing.

B. Slide the bushing and large sheave onto the auger gear reducer input shaft with a key.

(See Figure 5X.)

C. Loosely bolt the bushing and small sheave together with the screws provided with the bushing.

WARNING

To ensure that the drive is not unexpectedly started, turn OFF and lock out the
power source before proceeding. Failure to observe these precautions could
result in bodily injury.

CAUTION

Wedging forces in the bushing saw slot, such as that exerted by a narrow edged
regular screw driver, may damage or break the bushing. This damage would not
be covered under the GSI warranty.

Advertising