Guard assembly, D a key, See figure 5p on – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-720-G2 User Manual

Page 35: For bolt size

Advertising
background image

5. Assembly

PNEG-720-G2 12" and 16" Series II Sweep

35

Figure 5P

Guard Assembly

A. Attach the Guard Plate to the Tractor Drive Stand Legs using 3/8" bolts and nuts before attaching

the drive sprocket.

(See Figure 5Q on Page 36.)

B. Slide the twelve tooth drive sprocket, bushing and key (see key chart for your size key) onto the

output shaft of the reducer, make sure both sprockets line up.

(See Figure 5Q and Figure 5Q_A on

Page 36.)

C. Assemble the Bottom Chain Guard Trap to the Bottom Chain Guard Weldment using

1/2" x 3" HHCS bolts, 1/2" split lock washers and 1/2" hex nuts.

(See Figure 5P.)

D. Attach Bottom Chain Guard Weldment to Tractor Drive Stand using 3/8" x 1-1/4" HHCS bolts,

3/8" split lock washers and 3/8" hex nuts.

(See Figure 5I on Page 30.)

E. Attach Top Chain Guard Assembly to Tractor Drive Stand using 3/8" x 1" bolts, 3/8" split

lock washers and 3/8" hex nuts.

(See Figure 5Q on Page 36.)

56C Frame Four (4) 3/8"-16 x 1-1/4" Hex Bolts and 3/16" x 3/16" x 1" Key
143TC Frame Four (4) 3/8"-16 x 1-1/4" Hex Bolts and 3/16" x 3/16" x 1" Key
182TC Frame Four (4) 1/2"-13 x 1-1/4" Hex Bolts and 1/4" x 1/4" x 1" Key

NOTE:

Advertising