Motor jack and base assembly – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-720-G2 User Manual
Page 40
Advertising
![background image](/manuals/277865/40/background.png)
5. Assembly
40
PNEG-720-G2 12" and 16" Series II Sweep
Motor Jack and Base Assembly
A. Attach the Motor Mount Base Assembly to the Head Section using four (4) 3/4" x 2" bolts,
lock washers and hex nuts.
B. Attach the Motor Jack Assembly to the Motor Mount Base Assembly using four (4) 1/2"-13 x 1-1/2"
bolts, 1/2" flat washers and 1/2" hex nuts.
Figure 5V
Advertising