4 shut the analyzer down, 1 shut the analyzer down for an extended period, Maintenance – Hach-Lange PHOSPHAX indoor sc User Manual

Page 45

Advertising
background image

45

Maintenance

6.4 Shut the analyzer down

No special measures are necessary for taking out of operation for a
short period (up to a few days in frost-free ambient conditions).

Important note: If the power supply to the controller is interrupted,
frost damage may occur. Ensure that the instrument and tubing
cannot freeze.

1. Interrupt the measurement and switch the instrument to the

service state.

2. Isolate the analysis instrument from the controller.

6.4.1 Shut the analyzer down for an extended period

Important note: Always wear safety equipment when handling
chemicals.

Use the following procedure if the instrument is to be taken out of
operation for an extended period, or in the case of risk of frost.

1. Immerse the tubing for reagent and cleaning solutions in

distilled water.

Figure 19 Modification of PHOSPHAX sc

1

Overflow vessel

4

Valve block

2

Fitting of sample tube

5

Sample tube

3

Blind plug

Advertising
This manual is related to the following products: