A.17 option 10b plumbing and connections, Plumbing and connection options – Hach-Lange PHOSPHAX indoor sc User Manual

Page 93

Advertising
background image

93

Plumbing and connection options

A.17 Option 10b plumbing and connections

Option 10b uses two sc analyzers with one sample preparation
delivering a continuous sample stream that cannot be pressurized.
The samples of the sample preparation is going into Analyzer 1.
This analyzer must change to the 2-parameter configuration (see

A.2, page 66

). The sample line runs between both analyzers. Each

sc analyzer discharges waste into an open drain.

Refer to

Figure 39

and the following instructions for Option 10b:

1. Install the sample preparation unit.

2. Install the first Analyzer (Analyzer 1):

a. Feed the sample line from the sample preparation unit

through the analyzer (

Figure 39

, item 7). Use Seal Plug #3

to secure.

b. Feed the drain tube through the analyzer (item 6). Use Seal

Plug #3 to secure.

c. Remove the drain tube from the valve block connector.

d. Connect the sample line from the sample preparation unit

to the overflow vessel (bottom inlet) using the fittings.

e. Change the analyzer to the 2-parameter configuration.

Refer to

Connect a 2-parameter option, page 66

.

f.

Connect the sample line to the reworked overflow with the
overflow vessel. Refer to

Connect a 2-parameter option,

page 66

.

3. Install the second Analyzer (Analyzer 2):

a. Feed the sample line from the overflow vessels on

Analyzer 1 through Analyzer 2. Use Seal Plug #3 to secure.

b. Feed the drain tube through Analyzer 2. Use Seal Plug #3

to secure.

c. Connect the drain tube to the T-fitting.

d. Connect the sample line from Analyzer 1 to the bottom inlet

on the overflow vessel of Analyzer 2 using the fittings.

Advertising
This manual is related to the following products: