Spare parts, accessories, circuit diagrams – Hach-Lange BUHLER 2000 Water sampler User Manual

Page 60

Advertising
background image

Spare parts, accessories, circuit diagrams

Page 60

Manual Bühler 2000/1029

Valve system

1. Fixing holes

2. Hose connectors

3. Motor with protective cap

4. Connection cable

5. Pinch bolt

Valve system –front view-
-hose connections-

1. Pinch bolt

2. Pump - pressure

3. Air filter

4. Pump - vacuum

5. Metering vessel

Pressing on areas

Valve system – replacement of hoses-

1. Pull off the hoses leading to the Y-connectors of the valve system.
2. Remove the old hoses of the valve system.
3. Prepare the new hoses.
4. Insert the new hoses according to the position of the old ones.
5. Connect the ends of the Y-connectors with the pump according to the diagram:

2=pressure, 4=vacuum, 5=metering vessel and 3=air filter.

6. Check the correct functioning of the valve system by triggering a manual sample.

Valve system – principle of operation -

Inoperative position / aeration

Vacuum

Pressure

Advertising