4. Maintenance Inspection

68

4. Maintenance Inspection

4.1

Inspection Items and Schedule

Follow the maintenance inspection schedule below.

It is assumed that the equipment is operating 8 hours per day.

If the equipment is running continuously night and day or otherwise running at a high operating rate, inspect more

often as needed.

Visual inspection

Grease supply

Start of operation

{

After 1 month of operation

{

After 3 months of operation

{

{

(Sliding surface of the rod

(Note 1)

, Ball screw

(Note 2)

)

Every 3 months thereafter

{

{

(Sliding surface of the rod

(Note 1)

, Ball screw

(Note 2)

)

After 3 years of operation, or upon

reaching 5,000 km in traveled distance

{

Every year thereafter

{

Note 1 Apply grease to the sliding surface of the rod at the startup check if grease has been consumed, or

every three months.

For the RCS2W dustproof/splash-proof type, apply grease when the bellows is changed.

Note 2 [Applicable Units: RCS2-RA5C, RA5R, RGS5C, RGD5C, SR7BD, SRGS7BD, SRGD7BD]

4.2

External Visual Inspection

An external visual inspection should check the following things.

Main unit

Loose actuator mounting bolts, other loose items

Rod

Lubrication, dust, foreign object on sliding surfaces

Cables

Scratches, proper connections

Overall

Irregular noise, vibration

4.3

Cleaning

Ɣ Clean exterior surfaces as necessary.

Ɣ Use a soft cloth to wipe away dirt and buildup.

Ɣ Do not blow too hard with compressed air as it may cause dust to get in through the gaps.

Ɣ Do not use oil–based solvents as they can harm lacquered and painted surfaces.

Ɣ To remove severe buildup, wipe gently with a soft cloth soaked in a neutral detergent or alcohol.