PLEASE NOTE THE FOLLOWING:

PCIe 1 Lane Cable plugs are keyed with a single groove along one wide
side of the plug. The plug must be inserted into the socket with the
groove aligned properly.

Connect into your Slave Acquisition Modules from the correct channel
groupings on the 9CZi-A Master Control Module; meaning, your first Slave
Acquisition Module is connected from the CHANNEL 1-4 output, second
from the CHANNEL 5-9 output, third from the CHANNEL 9-12 output,
fourth from the CHANNEL 13-16 output, and last from the CHANNEL 17-
20 output.

If you are connecting less than 5 of the Slave Acquisition Modules, the
PCIe 1 Lane Channel Sync Outputs on the back of the Master Control
Module may not be skipped and must be connected in consecutive order
into the PCIe 1 Lane Channel Sync Inputs on the back of the corresponding
slaves.

PCIe 4 Lane Cable - Slave Acquisition Module to Master
Control Module SYNC Connection(s)

Now, let's continue making the PCI Express connections by cabling the PCIe
4 Lane Data Output
on the back of each 9xxSZi-ASlave Acquisition Module
to the PCIe 4 Lane Data Inputs on the back of your 9CZi-AMaster Control
Module
using PCIe 4 Lane cable(s) provided.