Terminology, 1 operation terminology, Terminology -1 – Yokogawa GC1000 Mark II Process Gas Chromatograph User Manual

Page 20: Operation terminology -1

Advertising
background image

<Toc> <Ind>

<2. Terminology >

2-1

IM 11B03A03-01E

3rd Edition : Aug. 23. 2006-00

2.

Terminology

2.1

Operation Terminology

Term

Description

Notes

Remote Mode

Local Mode

Status

Process
Manual
Lab

Operation Mode

Run
Pause
Stop

Measurement Status

Stream Sequence
Stream (continuous)
Stream (1 cycle)
Calibration
Validation

Method
Analysis Cycle
Warming Up Time
Peak Detection Stop Time
Pause Time
Purging

Status accessible without password,
LCD/key: used only for reference
GCMT: connectable
Status accessible by entering password
LCD/key: used for changing settings

Normal measurement and calibration
Manual operation
Measurement with automatic peak detection, like a lab GC

Mode in which measurement is running
Mode in which measurement pauses
Mode in which measurement stops

Continuously measures streams in order specified in Stream Sequence
Continuously measures the specified stream
Measures the specified stream once
Performs calibration of the specified number
Performs validation of the specified number
Configures action timing of various valves and other parameters
Time from start (0 second) to stop of analysis
Time for displacement in sample streams
Time to stop peak detection of chromatogram compulsorily
Time for measurement pause
Displacement of the gas in the pressurized/Type X purged enclosures
with a protection gas

T0201.EPS

Advertising