Actions of Stream (Continuous)

Actions are different according to the timing when Stream (continuous) is specified.

(1)

An action when the operation mode is transferred from Stop to Run while the mea-
surement status is in Stream (continuous) 2 and the operation mode is in Stop, is
shown in Figure 4.8.

W2

W2

W2

W2

W2

W2

W2

S2

S2

S2

S2

S2

S2

Run command

Time

Stream (Cont) 2

S2: Analysis cycles for stream 2

W2: Warming up time for stream 2

F0408.EPS

Figure 4.8

Action of Stream (Continuous) (1)

(2)

An action when Stream (continuous) 3 is specified before the following warming up
time starts while the measurement status is in Stream (continuous) 2 and the opera-
tion mode is in Run (i.e., Stream 2 is being measured), is shown in Figure 4.9.

W2

W3

W3

W3

W3

W3

W2

S2

S2

S2

S3

S3

S3

S3

Select the Stream (cont) 3

Time

Stram (Cont) 2

Stream (Cont) 3

S2, S3: Analysis cycles for streams 2 and 3

W2, W3: Warming up time for streams 2 and 3

F0409.EPS

Figure 4.9

Action of Stream (Continuous) (2)

(3)

An action when Stream (continuous) 3 is specified after the following warming up time
has started while the measurement status is in Stream (continuous) 2 and the opera-
tion mode is in Run (i.e., Stream 2 is being measured), is shown in Figure 4.10.

W2

W2

W3

W3

W3

W3

W2

S2

S2

S2

S2

S3

S3

S3

Select the Stream (cont) 3

Time

Stram (Cont) 2

Stram (Cont) 3

S2, S3: Analysis cycles for streams 2 and 3

W2, W3: Warming up time for streams 2 and 3

F0410.EPS

Figure 4.10

Action of Stream (Continuous) (3)