5 actions of validation, Actions of validation -17, Automatic validation – Yokogawa GC1000 Mark II Process Gas Chromatograph User Manual

Page 52

Advertising
background image

<Toc> <Ind>

<4. Outline of Software >

4-17

IM 11B03A03-01E

4.4.5

Actions of Validation

Validation 1 to 3 is allowed to be specified only when the measurement status is in Stream
Sequence 1 to 4 or in Stream (continuous) 1 to 31. Actions are different according to
settings. The same action is performed when the starting time comes at any timing during
analysis.

• Automatic Validation

(1)

An action when the starting time of Automatic Validation 1 comes while the measure-
ment status is in Stream Sequence 1 and the operation mode is in Run, is shown in
Figure 4.19.

W9

W3

W1

W2

W2

S1

S2

S9

W9

S9

S3

S1

Starting time of Automatic Validation 1

Time

Stream Sequence 1

Stream Sequence 1

Validation 1

S1 to S9: Analysis cycles for streams 1 to 9

W1 to W9: Warming up time for streams 1 to 9

F0419.EPS

Figure 4.19

Action of Automatic Validation (1)

(2)

An action when the starting time of Automatic Validation 1 comes while the measure-
ment status is in Stream (continuous) 1 and the operation mode is in Run, is shown in
Figure 4.20.

W9

W1

W1

W1

W1

S1

S1

S9

W9

S9

S1

S1

Starting time of Automatic Validation 1

Time

Stream (Cont) 1

Stream (Cont) 1

Validation 1

S1, S9: Analysis cycles for streams 1 and 9

W1, W9: Warming up time for streams 1 and 9

F0420.EPS

Figure 4.20

Action of Automatic Validation (2)

3rd Edition : Aug. 23. 2006-00

Advertising