Semiautomatic calibration – Yokogawa GC1000 Mark II Process Gas Chromatograph User Manual

Page 50

Advertising
background image

<Toc> <Ind>

<4. Outline of Software >

4-15

IM 11B03A03-01E

• Semiautomatic Calibration

The same action is performed when the calibration is specified at any timing during analy-
sis.

(1)

An action when Calibration 1 is specified while the measurement status is in Stream
Sequence 1 and the operation mode is in Run, is shown in Figure 4.15.

W7

W8

W3

W1

W2

S1

S2

S7

W7

S7

S8

S3

Select the Calibration 1

Time

Stream Sequence 1

Stream Sequence 1

Calibration 1

S1 to S8: Analysis cycles for streams 1 to 8

W1 to W8: Warming up time for streams 1 to 8

F0415.EPS

Figure 4.15

Action of Semiautomatic Calibration (1)

(2)

An action when calibration 1 is specified while the measurement status is in Stream
(continuous) 1 and the operation mode is in Run, is shown in Figure 4.16.

W7

W8

W1

W1

W1

S1

S1

S7

W7

S7

S8

S1

Select the Calibration 1

Time

Stream (Cont) 1

Stream (Cont) 1

Calibration 1

S1 to S8: Analysis cycles for streams 1 to 8

W1 to W8: Warming up time for streams 1 to 8

F0416.EPS

Figure 4.16

Action of Semiautomatic Calibration (2)

(3)

When Calibration 1 is specified while the measurement status is in Stream Sequence
1 to 4 or in Stream (continuous) 1 to 31 and the operation mode is in Stop or in Pause,
the measurement status is immediately changed to Calibration 1 and then Calibration
1 is performed. After Calibration 1 has been completed, the previous measurement
status is retrieved and the operation mode turns to Stop. The same action is per-
formed when Calibration 1 or 2 is specified.

3rd Edition : Aug. 23. 2006-00

Advertising