1 actions of stream sequence, Actions of stream sequence -10 – Yokogawa GC1000 Mark II Process Gas Chromatograph User Manual

Page 45

Advertising
background image

4-10

<Toc> <Ind>

<4. Outline of Software >

IM 11B03A03-01E

4.4.1

Actions of Stream Sequence

The same action is performed when the Stream Sequence is specified at any timing during
analysis.

(1)

An action when the operation mode is transferred from Stop to Run while the mea-
surement status is in Stream Sequence 1, is shown in Figure 4.5.

W2

W3

W1

W2

W3

W1

W1

S1

S2

S3

S1

S2

S3

Run command

Time

Stream Sequence 1

S1 to S3: Analysis cycles for streams 1 to 3

W1 to W3: Warming up time for streams 1 to 3

F0405.EPS

Figure 4.5

Action of Stream Sequence (1)

(2)

An action when Stream Sequence 2 is specified while the measurement status is in
Stream Sequence 1 and the operation mode is in Run, is shown in Figure 4.6.

W5

W6

W4

W5

W2

S1

S2

S5

W4

S4

S6

S4

Selet the Stream Sequence 2

Time

Stream Sequence 1

Stream Sequence 2

S1 to S6: Analysis cycles for streams 1 to 6

W1 to W6: Warming up time for streams 1 to 6

F0406.EPS

Figure 4.6

Action of Stream Sequence (2)

(3)

An action when Stream Sequence 1 is specified while the measurement status is in
Stream (continuous) 2 and the operation mode is in Run, is shown in Figure 4.7.

W2

W3

W1

W2

W2

S2

S2

S2

W1

S1

S3

S1

Select the Stream Sequence 1

Time

Stream (Cont) 2

Stream Sequence 1

S1 to S3: Analysis cycles for streams 1 to 3

W1 to W3: Warming up time for streams 1 to 3

F0407.EPS

Figure 4.7

Action of Stream Sequence (3)

(4)

When Stream Sequence 1 is specified while the measurement status is in Stream
Sequence 2 to 4 or in Stream (continuous) 1 to 31 and the operation mode is in Stop
or in Pause, the measurement status is immediately changed to Stream Sequence 1
and the operation mode to Stop. The same action is performed when Stream Se-
quence 2 to 4 is specified.

3rd Edition : Aug. 23. 2006-00