Semiautomatic validation – Yokogawa GC1000 Mark II Process Gas Chromatograph User Manual

Page 53

Advertising
background image

4-18

<Toc> <Ind>

<4. Outline of Software >

IM 11B03A03-01E

• Semiautomatic Validation

The same action is performed when the validation is specified at any timing during analy-
sis.

(1)

An action when Validation 1 is specified while the measurement status is in Stream
Sequence 1 and the operation mode is in Run, is shown in Figure 4.21.

W9

W3

W1

W2

W2

S1

S2

S9

W9

S9

S3

S1

Select the Validation 1

Time

Stream Sequence 1

Stream Sequence 1

Validation 1

S1 to 9: Analysis cycles for streams 1 to 9

W1 to W9: Warming up time for streams 1 to 9

F0421.EPS

Figure 4.21

Action of Semiautomatic Validation (1)

(2)

An action when Validation 1 is specified while the measurement status is in Stream
(continuous) 1 and the operation mode is in Run, is shown in Figure 4.22.

W9

W1

W1

W1

W1

S1

S1

S9

W9

S9

S1

S1

Select the Validation 1

Time

Stream (Cont) 1

Stream (Cont) 1

Validation 1

S1, 9: Analysis cycles for streams 1 and 9

W1, W9: Warming up time for streams 1 and 9

F0422.EPS

Figure 4.22

Action of Semiautomatic Validation (2)

(3)

When Validation 1 is specified while the measurement status is in Stream Sequence 1
to 4 or in Stream (continuous) 1 to 31 and the operation mode is in Stop or in Pause,
the measurement status is immediately changed to Validation 1 and then Validation 1
is performed. After Validation 1 has been completed, the previous measurement
status is retrieved and the operation mode turns to Stop. The same action is per-
formed when Validation 2 or 3 is specified.

3rd Edition : Aug. 23. 2006-00

Advertising