Yokogawa GC1000 Mark II Process Gas Chromatograph User Manual

Page 47

Advertising
background image

4-12

<Toc> <Ind>

<4. Outline of Software >

IM 11B03A03-01E

(4)

An action when Stream (continuous) 4 is specified while the measurement status is in
Stream Sequence 1 and the operation mode is in Run, is shown in figure 4.11.

W4

W4

W4

W4

W2

S1

S2

S4

W4

S4

S4

S4

Select the Stream (cont) 4

Time

Stream Sequence 1

Stream (Cont) 4

S1 to S4: Analysis cycles for streams 1 to 4

W1 to W4: Warming up time for streams 1 to 4

F0411.EPS

Figure 4.11

Action of Stream (Continuous) (4)

(5)

When stream (continuous) 1 is specified while the measurement status is in Stream
Sequence 1 to 4 or in Stream (continuous) 2 to 31 and the operation mode is in Stop
or in Pause, the measurement status is immediately changed to Stream (continuous)
1 and the operation mode to Stop. The same action is performed when Stream
(continuous) 2 to 31 is specified.

3rd Edition : Aug. 23. 2006-00

Advertising