Ro sets report types and generation times, Rm sets a report channel, Xg sets the time zone – Yokogawa Button Operated MV2000 User Manual

Page 105

Advertising
background image

4-32

M-4662

RO

Sets report types and generation

times

To specify no report types

Syntax

RO p1<terminator>
p1

Report type (OFF)

Query

RO?

Example

Set the report to none.
ROOFF

Description You can execute this command on models with

the /M1 math option.

To specify hourly, daily, hourly+daily, or
daily+monthly reports

Syntax

RO p1,p2,p3<terminator>
p1

Report type

HOUR

Hourly report

DAY

Daily report

HOUR+DAY

Hourly and daily reports

DAY+MONTH

Daily and monthly reports

p2

Date of generation (dd)

dd

Day (01 to 28)

p3

Time of generation (hh)

hh

Hour (00 to 23)

Query

RO?

Example

Generate a daily report at hour 9 everyday
(parameter p2 (“05” in this example) is invalid in
this case).
RODAY,05,09

Description • You can execute this command on models

with the /M1 math option.

• Parameter p2 is discarded if it is specified for

reports other than monthly and daily reports.

To specify daily+weekly reports

Syntax

RO p1,p2,p3<terminator>
p1

Report type (DAY+WEEK)

p2

Day of generation (SUN, MON, TUE, WED,

THU, FRI, SAT)

p3

Time of generation (hh)

hh

Hour (00 to 23)

Query

RO?

Example

Generate a daily report at hour 9 every day and
a weekly report at hour 9 every Tuesday.
RODAY+WEEK,TUE,09

Description You can execute this command on models with

the /M1 math option.

RM

Sets a report channel

To not use a report channel

Syntax

RM p1,p2<terminator>
p1

Report channel number

p2

Report channel ON/OFF (OFF)

Query

RM[ p1]?

Example

Disable the channel 001 report channel.
RM001,OFF

Description • You can execute this command on models

with the /M1 math option.

• Set parameter p1 according to the table in

section 4.3.

To use a report channel

Syntax

RM p1,p2,p3,p4<terminator>
p1

Report channel number

p2

Report channel ON/OFF (ON)

p3

Measurement, computation, or external

input channel number to be reported

p4

Conversion of the time unit for TLOG.SUM

computation
OFF

No conversion.

/S

Convert as though the physical
values are integrated in units of
seconds.

/MIN

Convert as though the physical
values are integrated in units of
minutes.

/H

Convert as though the physical
values are integrated in units of
hours.

/DAY

Convert as though the physical
values are integrated in units of
days.

Query

RM[ p1]?

Example

Use report channel number R01. Set the channel
number for generating reports to 001 and convert
the units of the summed value to seconds.
RMR01,ON,001,/S

Description • You can execute this command on models

with the /M1 math option.

• Set parameters p1 and p3 according to the

table in section 4.3.

• About p4
Because the sampled data is integrated

over each scan interval, the physical value
integrated over a given period may be different
from the actual integrated value. This occurs
if the given period is not equal to the scan
interval. In such case, set p4 to the same unit
as that of the physical value being measured.
The integrated value is found according to the
following converting equations that depend on
the parameter.

OFF

→ (measured value)

/S

→ (measured value) × scan interval

/MIN

→ (measured value) × scan interval/60

/HOUR → (measured value) × scan

interval/3600

/DAY → (measured value) × scan

interval/86400

The scan interval unit is seconds.

XG

Sets the time zone

Syntax

XG p1,p2<terminator>
p1

Offset time from GMT (–1300 to 1300)

Upper 2 digits: Hour (00 to 13)

Lower 2 digits: Minute (00 to 59)

p2

Time deviation limit (OFF, 10S, 20S, 30S,

1MIN, 2MIN, 3MIN, 4MIN, 5MIN)

4.6 Basic Setting Commands

Advertising
This manual is related to the following products: